<html><head></head><body><div class="ydp1450425ayahoo-style-wrap" style="font-family:Helvetica Neue, Helvetica, Arial, sans-serif;font-size:16px;"><div></div>
<div>You have my approval.</div><div><br></div><div>Mike</div><div><br></div>
</div><div class="ydp44d68571yahoo_quoted">
<div style="font-family:'Helvetica Neue', Helvetica, Arial, sans-serif;font-size:13px;color:#26282a;">
<div>On Saturday, November 3, 2018, 2:16:53 AM EDT, Wes Smith <wsmith5125@comcast.net> wrote:</div>
<div><br></div>
<div><br></div>
<div><div><div><div class="ydp44d68571yiv7595282348WordSection1"><p class="ydp44d68571yiv7595282348MsoNormal">Hi All,<b></b></p><p class="ydp44d68571yiv7595282348MsoNormal"> </p><p class="ydp44d68571yiv7595282348MsoNormal"><b>This is an urgent request</b>; I didn\u2019t want to wait till our Thursday BOD meeting. Time is of the essence. I had several discussions and visit with Duncan Mellor P.E. Principal <g data-gr-id="23" id="23" class="gr_ gr_23 gr-alert gr_gramm gr_hide gr_disable_anim_appear Grammar">Costal</g> Engineer from Tighe & Bond regarding the PYC Pier.</p><p class="ydp44d68571yiv7595282348MsoNormal"> </p><p class="ydp44d68571yiv7595282348MsoNormal">This memo requests permission to engage the services of Tighe & Bond to provide an engineering scope of work for the PYC pier to determine what\u2019s required to be replaced and or <g data-gr-id="26" id="26" class="gr_ gr_26 gr-alert gr_gramm gr_hide gr_disable_anim_appear Grammar">repaired,</g> and conduct a load capacity of the pier. The cost of this engineering analysis is $2,500</p><p class="ydp44d68571yiv7595282348MsoNormal"> </p><p class="ydp44d68571yiv7595282348MsoNormal">Duncan and I further discussed the NHDES wetland permit expiring in February <g data-gr-id="32" id="32" class="gr_ gr_32 gr-alert gr_gramm gr_hide gr_disable_anim_appear Grammar">2019,</g> and may have a possible way of doing the work without going through a new NHDES permit process. The new permit should be a <g data-gr-id="33" id="33" class="gr_ gr_33 gr-alert gr_gramm gr_hide gr_disable_anim_appear Grammar">25 day</g> review process by NH DES after submission. We need the attached scope of work before applying for the permit.</p><p class="ydp44d68571yiv7595282348MsoNormal"> </p><p class="ydp44d68571yiv7595282348MsoNormal">Please review the attached and grant me approval by Sunday Evening November 4<sup>th</sup>. My plans are to enter into a contract <g data-gr-id="28" id="28" class="gr_ gr_28 gr-alert gr_gramm gr_hide gr_disable_anim_appear Grammar">Monday</g> November 5<sup>th</sup>.</p><p class="ydp44d68571yiv7595282348MsoNormal"> </p><p class="ydp44d68571yiv7595282348MsoNormal">If you have questions please contact me.</p><p class="ydp44d68571yiv7595282348MsoNormal"> </p><p class="ydp44d68571yiv7595282348MsoNormal">Regards,</p><p class="ydp44d68571yiv7595282348MsoNormal"> </p><p class="ydp44d68571yiv7595282348MsoNormal"> </p><p class="ydp44d68571yiv7595282348MsoNormal">Wes Smith</p><p class="ydp44d68571yiv7595282348MsoNormal">RearComoodre@PortsmouthYC.org</p><p class="ydp44d68571yiv7595282348MsoNormal"> </p></div></div></div></div>
</div>
</div></body></html>