[Board] Pier pilings and span live load testing
Wes Smith
wsmith5125 at comcast.net
Sat Nov 3 00:14:54 MDT 2018
Hi All,
This is an urgent request; I didn't want to wait till our Thursday BOD
meeting. Time is of the essence. I had several discussions and visit with
Duncan Mellor P.E. Principal Costal Engineer from Tighe & Bond regarding the
PYC Pier.
This memo requests permission to engage the services of Tighe & Bond to
provide an engineering scope of work for the PYC pier to determine what's
required to be replaced and or repaired, and conduct a load capacity of the
pier. The cost of this engineering analysis is $2,500
Duncan and I further discussed the NHDES wetland permit expiring in February
2019, and may have a possible way of doing the work without going through a
new NHDES permit process. The new permit should be a 25 day review process
by NH DES after submission. We need the attached scope of work before
applying for the permit.
Please review the attached and grant me approval by Sunday Evening November
4th. My plans are to enter into a contract Monday November 5th.
If you have questions please contact me.
Regards,
Wes Smith
RearComoodre at PortsmouthYC.org
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://portsmouthyc.org/pipermail/board_portsmouthyc.org/attachments/20181103/ba975923/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: PYC TIGHE&BOND.pdf
Type: application/pdf
Size: 5617741 bytes
Desc: not available
URL: <http://portsmouthyc.org/pipermail/board_portsmouthyc.org/attachments/20181103/ba975923/attachment.pdf>
More information about the Board
mailing list